Home   News   Testimonials   Contact us
Our People   Current Projects    Our Portfolio   Design/Build   VP Buildings
 RJ Taylor Multi-Family and Commercial Construction Portfolio: Frito Lay, Inc.-Industrial
 Back to Portfolio Page

81400010.jpg << >> CUSTOMER:
Frito Lay, Inc.

ARCHITECT:
NH Architecture

THE SITUATION:

Familiar with the design build method, Frito Lay chose R.J. Taylor because R.jJ. Taylor is a pioneer in the design-build construction method. This 40,000sf warehouse distribution facility consisted of office, expandable high bay storage, a free standing maintenance shop, and a 150,000 gallon back up water storage tank. Work through NYSDEC, Army Core of Engineers and difficult local planning boards, R.J. Taylor’s mastery of the approval process allowed the team to start construction before the final approvals. The project was delivered on time and within budget with quality second to none.



THE SOLUTION:
•V.P. Pre-Engineered buildings
•Fire pump w/ 150,000 gallon above ground storage
•Secured storage facility





Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial

Frito Lay, Inc.-Industrial